Council
Planning applications in Peak District
72 planning applications were submitted in Peak District in the last 30 days. The most common type was tree works (28). 1 was approved in this period.
For construction businesses
Find construction opportunities in Peak District
PlanFalcon monitors planning applications here and helps contractors, subcontractors and suppliers identify the projects worth pursuing — ranked for your trade and territory, not listed by date.
Relevant to groundworks, civil engineering and construction supply teams.
20 most recent applications
- NP/DIS/1126/113612 Nov 2026Undecided
Bretton Moor Quarry Bretton Moor Eyam Edge
Discharge of Conditions 45, 46 and 47. on NP/DDD/0914/0990.
- NP/TCA/1126/114012 Nov 2026Undecided
The Farm Main Street Great Longstone
T1 - 50% height reduction and trim on sides of Laurel hedge T2- 30% crown reduction of Cherry tree T3 - 30% crown reduction of Rowan tree
- NP/DDD/1126/114312 Nov 2026Undecided
Old Farm House Creamery Lane Parwich
Proposed rear single storey extension to the house and single storey extension to the outbuilding
- NP/TCA/1126/114411 Nov 2026Undecided
The Barn, Main Street, Little Longstone, DE45 1NN
T1; 2.5m crown raise of Silver Birch tree T2; 2.5m crown raise of Willow tree T3-6; 4m crown raise of Sycamore tree T7; 4m crown raise of Ash tree
- NP/TCA/1126/114111 Nov 2026Undecided
Dagnall House, The Avenue, Bakewell, DE45 1FB
5-Day Notification of Work to Dangerous Trees T1 – 3 x Common Ash W3W - precluded.presides.calibrate Observations - Neighbouring trees. Poor structural and physiological condition. Small cluster (3) of Ashes, one seems completely dead, the other 2 look mostly dead >80%. Ash die back. Long leggy stems leaning toward access road and corner of parking area. Recommendations - Fell low as possible. Chip and spray into undergrowth
- NP/DDD/1126/113210 Nov 2026Undecided
Cartref 8 Derwent Lane Hathersage
Replacement extension with external stair access to rear garden, and internal remodelling of existing dwelling.
- NP/HPK/1126/112610 Nov 2026Undecided
Overbrook Cottage Unnamed Road From Ivy Cottage To Long Hill Fernilee
Extension of residential use of site to include new rear balcony over stream. Widened rear window/door opening
- NP/DDD/1126/112810 Nov 2026Undecided
Cartref 8 Derwent Lane Hathersage
Replacement extension with external stair access to rear garden, and internal remodelling of existing dwelling.
- NP/GDO/1126/113510 Nov 2026Undecided
Lower Moorside Onecote Road Onecote
GDO Notification - Portal frame agricultural machinery store.
- NP/SM/1026/108210 Nov 2026Undecided
Homestead Cottage The Green Alstonefield
Removal of rear porch to cottage, addition of small single storey extension to provided dining area. Addition of pitched roof to rear, new back door, windows and French doors to north-east elevation, raising lintol into out-building and addition of rooflights
- NP/DIS/1026/106510 Nov 2026Undecided
Lane Head Farm Douse Lane Onecote
Discharge of condition 7 on NP/SM/1025/1004.
- NP/TCA/1126/113310 Nov 2026Undecided
Hardy House Farm, Main Road, Little Hucklow, SK17 8RT
Remove a Leylandii hedge which has grown to around 3 meters wide and 5 meters high so it takes up a lot of space in the garden. It is growing above a dry stone wall that runs along the lane through little hucklow. I am concerned about it knocking the wall down, it is also very hard to maintain due to its height and is encroaching on the road. I am hoping to remove it and to replace it with a wildlife friendly hedge.
- NP/DDD/1026/109210 Nov 2026Undecided
Hartshill Yeld Road Bakewell
Proposed alterations to dwelling, changes to landscaping, erection of garden shed and installation of EV charger.
- NP/DDD/1026/108910 Nov 2026Undecided
Ribblesdale Yeld Road Bakewell
Proposed alterations to dwelling, changes to landscaping, erection of garden shed and installation of EV charger.
- NP/HPK/1126/112910 Nov 2026Undecided
Shop Farm Unnamed Road From A53 To Brand Top Farm Brandside
Lawful Development Certificate for a proposed use - Erection of a detached triple garage.
- NP/TCA/1126/11259 Nov 2026Undecided
The Old Barn South View Bamford Derbyshire S33 0DY
T1 - Ash (Fraxinus excelsior), mature. Approx. 18 m height, 15 m crown spread, 90 cm DBH. Located at the gateway / turning circle corner at the rear of the property. Proposed works: 1. Reduce the previously cut left-hand limb back to a suitable growth point, removing the remainder of the branch, to take weight away from two cavities located approximately halfway along the limb. 2. 30% crown reduction across the whole tree, cutting back to suitable growth points. 3. Remove a small number of dead branches showing possible early signs of ash dieback. Symptoms are minimal and the tree is otherwise in reasonable condition. Reasons: The tree is large for its location and stands close to a new extension currently under construction. The limb reduction removes load from the cavities to reduce the risk of limb failure. The crown reduction brings the tree into proportion with its surroundings and the new building, and the deadwood removal reduces the risk of falling branches. T... read more
- NP/HPK/1126/11089 Nov 2026Undecided
Ashopton Fidlers Well Bamford
Installation of Air Heat Pump and Solar Panels
- NP/TCA/1126/11279 Nov 2026Undecided
The Mount Yeld Road Bakewell
Yew T1 - Crown lift over road by 1 metre and clear around utility cables
- NP/HPK/1126/11189 Nov 2026Undecided
Treaks Pringle Farm Buxton Road Castleton
Use of residential mobile home as full time residential accommodation and associated works
- NP/TCA/1126/11309 Nov 2026Undecided
Brookside Cottage, Pothooks Lane, Butterton, ST13 7SY
Three coniferous trees (pine) to be fully removed in private garden due to impacts on dwelling roof and warping garden wall.
How quickly Peak District decides planning applications
Figures for Peak District National Park.
- Decided within the standard time
- 60%
- England 52% · 101st fastest of 304 councils
- Applications approved
- 87%
- England 87% · 185th highest of 304 councils
- Decisions in the year
- 513
- 6 major schemes
The standard time is 8 weeks, or 13 for major schemes, with no extension agreed. Counting extensions the applicant agreed to, 92% were decided on time (England 90%), which is the government’s headline measure. Of 6 major schemes, such as 10 or more homes or 1,000 m² of new floor space, 100% were approved.
Source: MHCLG planning application statistics (table PS2), July 2025 to June 2026. See how every council in England compares.
PlanFalcon helps construction teams turn planning activity in Peak District into prioritised sales opportunities, with AI summaries and relevance signals for the trades you work in. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.
Planning and procurement records contain public sector information licensed under the Open Government Licence v3.0.