Council

Planning applications in East Devon

123 planning applications were submitted in East Devon in the last 30 days. The most common type was tree works (27). 4 refused in this period.

For construction businesses

Find construction opportunities in East Devon

PlanFalcon monitors planning applications here and helps contractors, subcontractors and suppliers identify the projects worth pursuing — ranked for your trade and territory, not listed by date.

Relevant to groundworks, civil engineering and construction supply teams.

A free weekly email of new applications here, scored for construction relevance, with householder and minor works scored down. Unsubscribe anytime.

20 most recent applications

  • 26/2319/DOC13 Nov 2026
    Undecided

    Sowden House Longbrook Lane Lympstone Devon EX8 5BE

    Discharge of condition for 24/1680/LBC: Condition 3 (Boundary wall repairs)

  • 26/2309/AGR12 Nov 2026
    Undecided

    Lower Comberoy Farm Broadclyst EX5 3DR

    Application to determine if Prior Approval is required for a new earth bank lagoon proposed for the existing dairy farm, an excavated hole surrounded with a 1m bund measuring 57m x 41m, and 5m deep.

  • 26/2305/DOC12 Nov 2026
    Undecided

    Halls Farm Higher Metcombe Ottery St Mary EX11 1SS

    Discharge of condition for 25/1931/LBC: Condition 3 (Materials) & Condition 4 (Floor and Roof Structure)

  • 26/2116/LBC12 Nov 2026
    Undecided

    The Old Rectory Rockbeare Exeter EX5 2LT

    Replace 1no. window on ground floor rear (west) elevation

  • 26/2312/DOC12 Nov 2026
    Undecided

    51 Winslade Park Avenue Clyst St Mary Devon EX5 1DB

    Discharge of condition for 26/1579/FUL: Condition 3 (Surface water drainage), Condition 4 (Cladding)

  • 26/2303/DOC12 Nov 2026
    Undecided

    Halls Farm Higher Metcombe Ottery St Mary EX11 1SS

    Discharge of condition for 25/1930/FUL: Condition 4 (Surface Water Drainage)

  • 26/2299/DOC11 Nov 2026
    Undecided

    Land Adjacent Cloakham Lawn And Chard Road Chard Road Axminster

    Discharge of Condition for 26/0952/VAR: Condition 5 (landscape and ecological management plan), condition 10 (construction management plan) and condition 14 (30 year landscape and ecology management plan)

  • 26/2302/DOC11 Nov 2026
    Undecided

    3 Bakers Cottages Longmeadow Road Lympstone Exmouth EX8 5LP

    Discharge of Condition for 26/1611/VAR: Condition 3 (materials) and Condition 4 (rooflights).

  • 26/2293/DOC11 Nov 2026
    Undecided

    Sidbury Cricket Club Mill Field Bridge Street Sidbury

    Discharge of condition for 22/0970/FUL: Condition 3 (Materials and finishes), Condition 6 (Drainage)

  • 26/2125/MRES11 Nov 2026
    Undecided

    Land At Cobdens North Of London Road East Of Cranbrook

    Reserved matters details (layout, scale, landscaping and appearance) related to phase 1 for 99 dwellings and associated infrastructure pursuant to the grant of outline planning permission 22/0406/MOUT

  • 26/2282/TRE11 Nov 2026
    Undecided

    Yew Tree 54B Douglas Avenue Exmouth Devon EX8 2HE

    T1, Beech : crown reduce by up to 4m maximum diameter of cut (MDC) 75mm, reduce northwestern canopy approximately to previous pruning points approximately 2m, MDC 50mm. T2, Silver Maple: pollard at 6m above ground level. T3, Monterey Pine : reduce extending northwestern branches by 3m, MDC 75mm. G4, Elms : remove (all dead).

  • 26/2284/TRE11 Nov 2026
    Undecided

    Land To North And East Of Bulverton Estate Adjacent To B3176 Station Road Sidmouth EX10 8XW

    T2, Holm Oak : Reduce eastern pollarded stem by 2-3m. T3, Holm Oak : Reduce eastern and central stems by 2-3m. T4, Holm Oak : Crown reduce eastern aspect by 2-3m. T5, Holm Oak : Pollard at approximately 4m above ground level. T6, Holm Oak : Reduce tagged stems to main union approximately 3-4m above ground level. T8, Holm Oak : Reduce eastern aspect limb by 2-3m. T9, Holm Oak : Remove snapped limb. T10, Scots Pine : Dismantle to leave an approximate 5-6m stump, ensure finished height is not within falling distance of the highway.

  • 26/2291/TRE11 Nov 2026
    Undecided

    Ivy Dene Broadway Woodbury Exeter EX5 1NN

    T1, Oak : reduce height of 2 primary stems by 6m to appropriate growth points, maximum diameter of cuts 175mm & 150mm. Reduce retained lateral limbs by 2-3m, maximum diameter of cuts 100mm & 75mm. Reduce lowest south westerly limb by removing the dead end portions back to live growth.

  • 26/2133/VAR11 Nov 2026
    Undecided

    Peradon Farm Clyst Hydon Cullompton EX15 2NG

    Application to vary condition 5, (historic building appraisal report) and condition 9 (arboricultural survey), on application 19/1848/FUL (Conversion of traditional farm barns to 5 no residential dwellings) submission of a digital historic building appraisal report and updated arboricultural report.

  • 26/2184/FUL10 Nov 2026
    Undecided

    Dirks Garden Birchill Axminster EX13 7LF

    Erection of a 25 square metre natural timber horticultural greenhouse structure on land with established lawful horticultural use under approval 4725 EJ/7138 dated 17th March 1967

  • 26/2290/TRE10 Nov 2026
    Undecided

    5 High Bank West Hill Devon EX11 1XX

    T246, Oak : reduce laterals extending over neighbour's garden by circa 2m, with maximum diameter of cuts 50mm. T247, Oak : reduce height by circa 2m, maximum diameter of cuts 75mm; reduce two lowest lateral limbs extending towards house by 2m, maximum diameter of cuts 50mm.

  • 26/2279/DOC10 Nov 2026
    Undecided

    Peradon Farm Lane To Peradon Farm Clyst Hydon

    Discharge of condition for 21/3120/MFUL: Condition 12 (Ecological Assessment)

  • 26/2213/FUL10 Nov 2026
    Undecided

    Downhams Farm Woodbury Salterton

    Construction of earth lined slurry lagoon with perimeter fencing

  • 26/2283/TRE10 Nov 2026
    Undecided

    8 Truro Drive Exmouth EX8 5QF

    T1, Oak : crown reduce the entire canopy by approximately 1.5m, with a maximum diameter of cuts (MDC) of 25mm; crown lift to achieve a minimum clearance of 2m above ground level, with an MDC of 25mm; remove any larger diameter deadwood.

  • 26/2145/AGR10 Nov 2026
    Undecided

    Land South Of Road To Woodbury Woodbury

    Application to determine if prior approval is required for an agricultural fertiliser store.

How quickly East Devon decides planning applications

Decided within the standard time
49%
England 52% · 183rd fastest of 304 councils
Applications approved
88%
England 87% · 149th highest of 304 councils
Decisions in the year
1,267
54 major schemes

The standard time is 8 weeks, or 13 for major schemes, with no extension agreed. Counting extensions the applicant agreed to, 80% were decided on time (England 90%), which is the government’s headline measure. Of 54 major schemes, such as 10 or more homes or 1,000 m² of new floor space, 83% were approved, including 20 of 26 major housing schemes.

Source: MHCLG planning application statistics (table PS2), July 2025 to June 2026. See how every council in England compares.

PlanFalcon helps construction teams turn planning activity in East Devon into prioritised sales opportunities, with AI summaries and relevance signals for the trades you work in. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.

Planning and procurement records contain public sector information licensed under the Open Government Licence v3.0.