Council
Planning applications in Dorset
418 planning applications were submitted in Dorset in the last 30 days. The most common type was tree works (130). 63 were approved and 4 refused in this period.
For construction businesses
Find construction opportunities in Dorset
PlanFalcon monitors planning applications here and helps contractors, subcontractors and suppliers identify the projects worth pursuing — ranked for your trade and territory, not listed by date.
Relevant to groundworks, civil engineering and construction supply teams.
20 most recent applications
- P/TRC/2026/0636213 Nov 2026Undecided
Friday Field Church Knowle BH20 5NQ
Lime: Fell. Oak: Pollard by 3 metres to a height of 7 metres.
- P/FUL/2026/0623813 Nov 2026Undecided
Car Park Longmead Industrial Estate Longmead Shaftesbury SP7 8PL
Change of Use of a car park to a parking Depot for the parking of Refuse Collection vehicles, adjacent to an existing Depot, including fencing and lighting.
- P/TRT/2026/0637213 Nov 2026Undecided
Clayesmore School Blandford Road Iwerne Minster DT11 8LL
T1 - Yew - Fell and replant. T2 - Yew - Fell and replant. T3 - Yew - Fell and replant.
- P/FUL/2026/0635213 Nov 2026Undecided
Windmill Barrow Farm Access Road To Charborough Tower Lytchett Matravers BH16 6BT
Demolition and replacement of the existing dwelling and car port
- P/VOC/2026/0636813 Nov 2026Undecided
22 Norburton Burton Bradstock DT6 4QL
Variation of Condition 2 (plans) of permission P/HOU/2026/03800 (Erect single storey side extension) to: change flat roof to pitched roof, tiles to match main house; change doors to rear of property in bedroom to window; insert rooflight to rear 550mm wide x 980mm long central to 1800mm wide window.
- P/HOU/2026/0632513 Nov 2026Undecided
Olive Tree Cottage Fleet Road Fleet DT3 4ED
The erection of single and two-storey extensions and external alterations to the existing dwelling, including roof remodelling; alterations to the existing garage; erection of a detached garage, car port and log store; relocation of the principal vehicular access; and provision of associated parking and turning areas. (Amended Description)
- P/TRT/2026/0485813 Nov 2026Undecided
The Hollies Fir Tree Hill Alderholt SP6 3AY, Twin Oaks Fir Tree Hill Alderholt SP6 3AY and The White House Fir Tree Hill Alderholt SP6 3AY
T1 Oak (located at The Hollies): Reduce back western canopy by 2-3 metres extending over the driveways reducing back to a maintainable level while keeping cuts to a minimum diameter. T2 Oak (located at The White House): Reduce back southern canopy over gardens by 2-3 metres. T3 Oak (located at Twin Oaks): Reduce back southern canopy over gardens by 2-3 metres. Remove low limb.
- P/HOU/2026/0627913 Nov 2026Undecided
24 Cereleton Park Charlton Marshall DT11 9PL
Remove existing rear conservatory and replace with single storey extension
- P/TRT/2026/0637113 Nov 2026Undecided
571A Wimborne Road East Ferndown BH22 9NL
T1 Lawson Cypress: Fell to ground level. T2 Thuja: Fell to ground level. T3 Conifer: Fell to ground level.
- P/HOU/2026/0602413 Nov 2026Undecided
6 Culliford Way Weymouth DT3 6AN
Erect two storey rear extension
- P/HOU/2026/0497713 Nov 2026Undecided
Willis House West Orchard Shaftesbury SP7 0LJ
Erect outbuilding (demolish existing outbuilding)
- P/TRT/2026/0616012 Nov 2026Undecided
Former Alderholt Surplus Stores Daggons Road Alderholt SP6 3AA
T1 Birch: Fell to ground level. T2 Pine: Prune tertiary branches to give the proposed building 2-metres clearance. Prune to suitable lateral growth points with a proposed branch reduction of 1 metre aligning the finished crown profile with the existing scaffolding. T3 Birch: Reduce the crown height by approximately 4 metres to provide adequate clearance for the proposed building. Prune to suitable lateral growth points with final pruning cuts no greater than 75 mm in diameter aligning the finished crown profile with the existing scaffolding.
- P/VOC/2026/0638612 Nov 2026Undecided
4 Burdens Kingston Hazelbury Bryan DT10 2BJ
Erect Carport to the front. (with variation of condition 2 of planning permission P/HOU/2026/04065 to amend the car port to be open with no cladding).
- P/FUL/2026/0638512 Nov 2026Undecided
Huntingford Farm Huntingford Road Huntingford SP8 5QQ
Erect agricultural building and demolish existing agricultural building
- P/FUL/2026/0607812 Nov 2026Undecided
Land East of Verwood Town Football Club Potterne Park Potterne Way Verwood BH31 6RS
The relocation and installation of modular buildings and associated works. Change of use from agricultural land to a community cricket club (Use Class F2(c) )
- P/TRD/2026/0636712 Nov 2026Permitted
Cob Cottage 3 The Hollow Briantspuddle Dorchester DT2 7HX
T2 Oak - Remove snapped limb and the reduce the remaining crown over field by 2m.
- P/TRT/2026/0634912 Nov 2026Undecided
29 St Ives Wood Road Ashley Heath BH24 2EA
T1 Lawson Cypress: Fell.
- P/TRT/2026/0634512 Nov 2026Undecided
Clayesmore School Blandford Road Iwerne Minster DT11 8LL
T1 - Poplar - Reduce two lower branches (indicated on annotated photograph) extending due south east by 3m and remove ivy. T2 - Poplar - Remove ivy.
- P/HOU/2026/0635012 Nov 2026Undecided
23 Bowleaze Coveway Weymouth DT3 6PL
Replacement of existing conservatory with glazed infill incorporating first-floor accommodation. Alterations to existing windows and doors, including new first-floor balcony and Juliet balconies. External recladding, painting and alterations to finishes. Alterations to existing driveway and raised terrace, including formation of covered carport and improved pedestrian access. Conversion of existing detached garage to ancillary studio accommodation. Installation of solar panels.
- P/STA/2026/0641012 Nov 2026Undecided
Sleepbrook Farm Ringwood Road Alderholt SP6 3DF
Section 37 notification of overhead electricity line includding EIA screening
How quickly Dorset decides planning applications
- Decided within the standard time
- 59%
- England 52% · 106th fastest of 304 councils
- Applications approved
- 92%
- England 87% · 87th highest of 304 councils
- Decisions in the year
- 2,708
- 92 major schemes
The standard time is 8 weeks, or 13 for major schemes, with no extension agreed. Counting extensions the applicant agreed to, 92% were decided on time (England 90%), which is the government’s headline measure. Of 92 major schemes, such as 10 or more homes or 1,000 m² of new floor space, 88% were approved, including 40 of 46 major housing schemes.
Source: MHCLG planning application statistics (table PS2), July 2025 to June 2026. See how every council in England compares.
PlanFalcon helps construction teams turn planning activity in Dorset into prioritised sales opportunities, with AI summaries and relevance signals for the trades you work in. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.
Planning and procurement records contain public sector information licensed under the Open Government Licence v3.0.