Council
Planning applications in Brentwood
61 planning applications were submitted in Brentwood in the last 30 days. The most common type was extensions (13). 4 were approved and 1 refused in this period.
For construction businesses
Find construction opportunities in Brentwood
PlanFalcon monitors planning applications here and helps contractors, subcontractors and suppliers identify the projects worth pursuing — ranked for your trade and territory, not listed by date.
Relevant to groundworks, civil engineering and construction supply teams.
20 most recent applications
- 26/01092/HHA12 Nov 2026Undecided
24 Tennyson Road Hutton Essex CM13 2SJ
Additional floor to existing 3 bed bungalow with new roof profile; minor extension to side, front and rear and part demolition of utility room to form 4 bedroom house.
- 26/01135/HHA12 Nov 2026Undecided
Holly House 73 Burses Way Hutton Essex CM13 2PX
Extension to garage out-building and provision of side lights to entrance of main building.
- 26/00978/ADV11 Nov 2026Undecided
47C High Street Brentwood Essex CM14 4RH
Replace existing signage with new colour branded signage.
- 26/01193/HHA11 Nov 2026Undecided
21 Gerrard Crescent Brentwood Essex CM14 4JU
Hip to gable roof extension, add front dormer with front and rear rooflights, apply render finish to the rear elevation.
- 26/01215/FUL10 Nov 2026Undecided
57 Woodland Avenue Hutton Essex CM13 1HG
Demolition of existing garage and extension of 57 Woodland Avenue to provide self-contained 3 bedroom bungalow with off street parking, cycle parking and private amenity space.
- 26/01298/PN4210 Nov 2026Undecided
16 Warwick Place South Weald Essex CM14 5QB
Demolish existing ground floor rear extension. Single storey ground floor rear extension. The proposed extension would extend 8m beyond the rear wall of the original dwelling, the maximum height of the proposed extension would be 3.58m and the proposed eaves would be 3.33m.
- 26/01231/HHA9 Nov 2026Undecided
43 Surman Crescent Hutton Essex CM13 2PW
Roof extension to form new rear gable in place of existing dormer window, insertion of roof lights to side elevations and internal alterations.
- 26/01164/FUL9 Nov 2026Undecided
122 Pondfield Lane Brentwood Essex CM13 2DB
Construction of new annexe to allow housing of disabled family member.
- 26/01187/HHA9 Nov 2026Undecided
Norton House 33 Fryerning Lane Ingatestone Essex CM4 0DD
Removal of existing conservatory; proposed single storey rear extension to create new kitchen, dining and family space; proposed single storey side extension to create small garden room and proposed length of garden wall at boundary.
- 26/01100/FUL6 Nov 2026Undecided
Hutton Cricket Club Hall Green Lane Hutton Essex CM13 2QT
Installation of artificial cricket pitch strip.
- 26/01289/TPO6 Nov 2026Undecided
9 Baymans Wood Shenfield Essex CM15 8BT
Removal of oak tree TPO Number: TPO2/1976
- 26/01022/HHA6 Nov 2026Undecided
9 Park Way Shenfield Essex CM15 8LH
Construction of a two-storey rear extension, alterations to the roof to facilitate a loft conversion including front and rear dormer windows. Construction of a new front porch, alterations to existing fenestration, and alterations to the front landscaping to provide additional parking.
- 26/01288/HHA6 Nov 2026Undecided
60 Fairview Avenue Hutton Essex CM13 1NS
Proposed two storey rear extension and changes to fenestration.
- 26/01111/FUL6 Nov 2026Undecided
8 Birley Grange 30 Hall Lane Shenfield Essex CM15 9AL
Erection of Gazebo
- 26/01304/TEL5 Nov 2026Permitted
Kings House 101 - 135 Kings Road Brentwood Essex CM14 4DR
Proposed telecomunication equipment. Addition of 6 No. TEF antennas on 3 No. support poles, 2 No. 0.3mm dishes, 15 No. ERS, along with 2 No. dishes, and ancillary development.
- 26/01176/FUL5 Nov 2026Undecided
Oak Cottage 550 Rayleigh Road Hutton Essex CM13 1SG
Demolition of existing outbuildings and erection of one detached dwelling with associated parking and landscaping.
- 26/01191/HHA5 Nov 2026Undecided
322 Roman Road Mountnessing Essex CM15 0TZ
First floor extension over existing ground floor and associated works including the insertion of dormer windows and roof lights.
- 26/01189/HHA5 Nov 2026Undecided
85 Oliver Road Shenfield Essex CM15 8PX
Proposed loft conversion with associated works including roof extension to form a gable end and front and rear dormer windows.
- 26/01169/FUL5 Nov 2026Undecided
Lingwood Ashwells Road Pilgrims Hatch Essex CM15 9SE
Construction of a single detached dwelling house.
- 26/01279/TPO4 Nov 2026Undecided
Putnam House 17 Ridgeway Hutton Essex CM13 2LP
T1 Oak reduce by 2-2.5m and re shape T2 Oak reduce by 2m and re shape TPO Number: TPO141/1992 TPO20/1975
How quickly Brentwood decides planning applications
- Decided within the standard time
- 30%
- England 52% · 281st fastest of 304 councils
- Applications approved
- 83%
- England 87% · 242nd highest of 304 councils
- Decisions in the year
- 668
- 16 major schemes
The standard time is 8 weeks, or 13 for major schemes, with no extension agreed. Counting extensions the applicant agreed to, 88% were decided on time (England 90%), which is the government’s headline measure. Of 16 major schemes, such as 10 or more homes or 1,000 m² of new floor space, 88% were approved, including 9 of 10 major housing schemes.
Source: MHCLG planning application statistics (table PS2), July 2025 to June 2026. See how every council in England compares.
PlanFalcon helps construction teams turn planning activity in Brentwood into prioritised sales opportunities, with AI summaries and relevance signals for the trades you work in. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.
Planning and procurement records contain public sector information licensed under the Open Government Licence v3.0.