Council

Planning applications in Energy Consents Unit

4 planning applications were submitted in Energy Consents Unit in the last 30 days.

For construction businesses

Find construction opportunities in Energy Consents Unit

PlanFalcon monitors planning applications here and helps contractors, groundworks firms and civil engineering teams identify the projects worth pursuing — ranked for your trade and territory, not listed by date.

Relevant to groundworks, civil engineering and construction supply teams.

A free weekly email of new applications here, scored for civils scope — drainage, highways, groundworks and structures. Unsubscribe anytime.

10 most recent applications

  • ECU0000639121 Oct 2026

    DG Route tie-in

    Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.

  • ECU000064919 Oct 2026

    Dunvegan GSP

    The development comprises construction of a new Brogaig Primary substation, installation of 18km 33kV OHL and re-routing a short 1.4km section of 33kV underground cable route (UGC). The Screening Request relates to the installation of new OHL only. The new substation will be subject to Town and Country Planning Permissions and the UGC can be constructed within the permitted development rights afforded to SHEPD as an electrical undertaker, under Class 40 1 (a) of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992. The new OHL installation is proposed between the new Brogaig Primary substation (National Grid Reference: NG 45807 68192) and Pole 13, located to East to the A855 on the Northern edge of Loch Leathan in vicinity of (National Grid Reference: NG 50874 52763). The OHL will be installed to include a single circuit rated to 33kV specification on wood pole structures.

  • ECU000064897 Oct 2026
    Undecided

    Mains of Gartly Farmhouse, Gartly, Huntly, AB54 4QB

    Existing single user overhead line will now be multiuse overhead line

  • ECU000064865 Oct 2026
    Undecided

    Bowbeat Repower

    The construction and operation of the repowered Bowbeat Wind Farm comprising up to 9 turbines with a maximum blade tip height of 230m with a combined capacity exceeding 50MW, including battery energy storage and ancillary infrastructure.

  • ECU0000648129 Sep 2026
    Undecided

    FCU657 Mains of Ury

    As part of reinforcement of the existing 11k OHL Pole 15 is required to be replaced with a 14m pole from the current 8.53m pole. This is due to a 70mm conductor being installed.

  • ECU0000646323 Sep 2026
    Undecided

    Central Scotland 400kV Upgrade (XL Route)

    Increase the operating voltage of the 10.5km long section of overhead line between the downleads at tower XL001A, grid reference NS92348823 and mid span beyond XL033 at Blairingone, grid reference NS98309677, from 275 to 400 kilovolts (kV) to enable an increase in its capacity; Reconductor (i.e. changing the wires) between towers XL12 and XL20 as part of increasing the operating voltage of XL route; Construct four new overhead line towers to turn in and connect XL route to the proposed Kincardine North Substation; Remove one existing overhead line tower (XL05); and Install temporary masts to divert one circuit of XL route to enable construction of towers and removal of existing tower. Associated access works, scaffolding, working areas, laydown areas and pulling positions for conductors.

  • ECU0000646523 Sep 2026
    Undecided

    Central Scotland 400kV Upgrade (ZCS Route)

    Construct four new overhead line towers to turn in and connect ZCS route to the proposed Kincardine North Substation at 400kV; Remove one existing overhead line tower (ZCS019); and Install overhead line spans at 275kV on temporary supports to divert one circuit of ZCS route to enable construction of towers and removal of existing tower ZCS019. Associated access works, working areas, laydown areas and pulling positions for conductors.

  • ECU0000642723 Sep 2026
    Undecided

    Brevig Harbour Reconductoring

    The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD copper conductors supported across eight poles. The overhead line section referenced in this notification is approximately 0.68 km in length and provides the connection between the 11 kV cable at existing Pole P7 and the existing Brevig Harbour Ring Main Unit (RMU).

  • ECU0000648022 Sep 2026
    Undecided

    New telecoms mast site on land near Bridge of Balgie, Lawers

    The Project comprises of construction of a new 33kV overhead line spur in order to provide a new connection for a new telecoms mast site situated at Land near Bridge of Balgie, Lawers, Perth. The new 33kv spur will come from current H Pole 43 (as marked on plan) of the current line. The spur will consist of 1 new single poles and 1 new H pole, which will house pole mounted plant equipment and transformer (New pole 1 & 2). The new overhead line will be installed using poles of a wooden variety and both new poles approximately 12 meters in height. The total length of the 33kv overhead line spur will be 24 metres. The overhead line will span between current pole 43 and new pole 2. For information, the line will move to underground cable from the pole 2 to meet the new development. This will be installed under permitted development.

  • ECU0000647917 Sep 2026

    FDL037/KS Deerhill

    Retrospective Consent for existing Line now subject to Section 37 consent: Seven spans of High Voltage overhead supported by wooden poles,

PlanFalcon helps construction teams turn planning activity in Energy Consents Unit into prioritised sales opportunities, with AI summaries and relevance signals for civils, groundworks, drainage, highways and structures. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.