Council
Planning applications in Elmbridge
18 planning applications were submitted in Elmbridge in the last 30 days. The most common type was tree works (5). 2 were approved in this period.
For construction businesses
Find construction opportunities in Elmbridge
PlanFalcon monitors planning applications here and helps contractors, subcontractors and suppliers identify the projects worth pursuing — ranked for your trade and territory, not listed by date.
Relevant to groundworks, civil engineering and construction supply teams.
20 most recent applications
- 2026/26433 Nov 2026Undecided
16 Clare Hill Esher Surrey KT10 9NB
Non-Material Amendments to planning permission 2024/1383 to alter the internal layout, to add a sliding door to rear elevation, amendment to sliding doors at living room on ground floor, alterations to the configuration of the south dormer window, reconfiguration of the roofs of the three rear dormers, modifications to the design of the new east chimney and to omit the solar panels from the roof.
- 2026/26382 Nov 2026Undecided
Manor House Woodstock Lane North Long Ditton Surbiton Surrey KT6 5HL
Long Ditton Conservation Area - T1 Purple leaf plum: - Reduce the two limbs overhanging the boundary back to within the boundary to suitable growth points T2 Oak: - Two meter lateral reduction to bring the over-extended lower limb back within the natural canopy line
- 2026/260728 Oct 2026Undecided
Hersham Place Technology Park Molesey Road Hersham Walton-On-Thames Surrey KT12 4RZ
Confirmation of Compliance with Condition: 7 (Phasing Plan) of planning permission 2025/2530.
- 2026/260828 Oct 2026Undecided
Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH
Confirmation of Compliance with Conditions: 6 (Additional arboricultural information) and 7 (Tree planting and maintenance) of planning permission 2026/1551.
- 2026/262328 Oct 2026Undecided
Pavement O/S 1 Manor Cottages Station Road Stoke D'Abernon Cobham Surrey KT11 3BL
PNT - Telecommunications Notification: Intent to install 1no. 8m wooden pole to facilitate fixed line broadband electronic communications.
- 2026/261828 Oct 2026Permitted
16 Medina Avenue Esher Surrey KT10 9TH
Roof extension with rear dormer window and juliet balcony to provide rooms in the roofspace with front rooflights.
- 2026/260428 Oct 2026Undecided
9 Woodend Park Cobham Surrey KT11 3BX
Tree Preservation Order EL:10/03 - T1 - Oak Tree - reduce tree from 22m high to 19m high; and from 20m wide to 18m wide so that we manage the size of the tree. Less stress and weight will be on the limbs. It is too large for the garden. The correct pruning techniques will be used.
- 2026/261028 Oct 2026Undecided
Brooklands College Heath Road Weybridge Surrey KT13 8TT
Confirmation of Compliance with Condition: 29 (Borehole decommissioning) of planning permission 2023/1359
- 2026/259227 Oct 2026Permitted
51A Palace Road East Molesey Surrey KT8 9DN
Non-Material Amendment to planning permission 2025/2660 to widen driveway, relocate bin store, replace a section of low wall and pier with a pier, reposition car parking arrangements and install EV charger with associated landscaping.
- 2026/258026 Oct 2026Undecided
35 Manor Road East Molesey Surrey KT8 9JY
East Molesey Kent Town Conservation Area - G1 - Group of Holly's acting as a hedge to trim back in line top and sides by 1-2 inches T1 - Cherry to Crown reduce by 0.5m-1m in length and thin by 25% T2 - Magnolia to Crown reduce by 0.5m-1m in length and thin by 25% T3 - Mimosa to Crown reduce by 2m-3m in length and thin by 10%
- 2026/258226 Oct 2026Undecided
2 Warren Way Weybridge Surrey KT13 0DL
Tree Preservation Order ELM:33 - Proposed works: Reduce the lime tree branches overhanging the garden at 2 Warren Way by up to approximately 1-1.5 metres, cutting back to suitable growth points and previous pruning points where practicable. Limit the work to the overhanging branches and retain a balanced, natural crown shape. Reason for the works: The branches extend over the garden and have put on approximately 1-1.5 metres of regrowth since previous pruning. The proposed reduction will manage the overhang and maintain clearance over the garden while retaining the tree's overall form and amenity.
- 2026/258126 Oct 2026Undecided
Merrywood Weston Green Thames Ditton Surrey KT7 0JZ
Confirmation of Compliance with Condition: 17 (Site supervision) of planning permission 2024/0748.
- 2026/257626 Oct 2026Undecided
57 Palace Road East Molesey Surrey KT8 9DN
East Molesey Kent Town Conservation Area - T1 Robinia Crown reduce back to previous points T2 Pear Cut out dead wood T3 Mulberry Reduce back to previous points T4 Walnut Trim east side and top back to previous points T5 Rowan Trim back to gutter height
- 2026/257423 Oct 2026Undecided
Telecommunication Mast Old Cranleighan Club Portsmouth Road Thames Ditton Surrey KT7 0HB
PNT - Telecommunications Notification: The removal of the existing 3no. antennas and the installation of 6no. new antennas, the removal of existing 1no. RBS Cabinet to be removed and replaced with 1no. PSC Cabinet and the development of ancillary equipment thereto.
- 2026/256923 Oct 2026Undecided
Garson House 1 Garson Road Esher Surrey KT10 8LN
West End Conservation Area - T2097 - Laurus nobilis (Bay/Bay Laurel/Poets Laurel) Reduce height - Specified extent. Reduce by c. 2.5 m.
- 2026/256623 Oct 2026Undecided
16 Eriswell Crescent Hersham Walton-On-Thames Surrey KT12 5DS
Single storey rear outbuilding with 1no. air conditioning unit.
- 2026/256022 Oct 2026Undecided
1 Beacon Mews South Road Weybridge Surrey KT13 9DZ
Confirmation of Compliance with Condition: Partial discharge of Condition 3 (Commercial/residential noise transmission) of prior approval 2025/0758.
- 2026/256322 Oct 2026Undecided
Feltonfleet School Byfleet Road Cobham Surrey KT11 1DR
Confirmation of Compliance with Conditions: 3 (Parking layout) and 5 (EV charging points) of planning permission 2026/1412.
- 2026/255121 Oct 2026Undecided
33 Burwood Road Hersham Walton-On-Thames Surrey KT12 4AB
Non-Material Amendment to planning permission 2025/1882 to reduce the proposal and only construct the single storey element of extensions approved including retention of the existing side lean-to.
- 2026/253820 Oct 2026Undecided
Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH
Confirmation of Compliance with Conditions: 8 (Bat precautionary working method statement (PWMS)), 9 (Ecological Enhancement Plan) and 10 (Construction Environment Management Plan (CEMP)) of planning permission 2026/1551.
How quickly Elmbridge decides planning applications
- Decided within the standard time
- 52%
- England 52% · 161st fastest of 304 councils
- Applications approved
- 80%
- England 87% · 268th highest of 304 councils
- Decisions in the year
- 1,590
- 26 major schemes
The standard time is 8 weeks, or 13 for major schemes, with no extension agreed. Counting extensions the applicant agreed to, 83% were decided on time (England 90%), which is the government’s headline measure. Of 26 major schemes, such as 10 or more homes or 1,000 m² of new floor space, 73% were approved, including 9 of 14 major housing schemes.
Source: MHCLG planning application statistics (table PS2), July 2025 to June 2026. See how every council in England compares.
PlanFalcon helps construction teams turn planning activity in Elmbridge into prioritised sales opportunities, with AI summaries and relevance signals for the trades you work in. Looking for construction opportunities rather than individual applications? See how PlanFalcon helps construction sales teams find projects earlier.
Planning and procurement records contain public sector information licensed under the Open Government Licence v3.0.